Kindergarten Morning Work

Forty daily pages, one predictable routine: trace the letter, trace the number and fill its ten frame, solve one small maths task, write your name, circle the weather. Set 1 ramps A to T and 1 to 20; set 2 finishes the alphabet and pushes to 30.

Ages 4-6

Updated October 2026

Morning work, set 1, day 1: letter A, number 1

Day 1 of the back-to-school set pairs letter A with number 1: trace Aa, colour 1 into the ten frame, then count a scatter of shapes and write how many.

Download PDF

Morning work, set 1, day 2: letter B, number 2

Day 2 of the back-to-school set pairs letter B with number 2: trace Bb, colour 2 into the ten frame, then keep an AB shape pattern going by drawing the two missing shapes.

Download PDF

Morning work, set 1, day 3: letter C, number 3

Day 3 of the back-to-school set pairs letter C with number 3: trace Cc, colour 3 into the ten frame, then circle whichever of two picture groups has more.

Download PDF

Morning work, set 1, day 4: letter D, number 4

Day 4 of the back-to-school set pairs letter D with number 4: trace Dd, colour 4 into the ten frame, then read tally marks and write the number they show.

Download PDF

Morning work, set 1, day 5: letter E, number 5

Day 5 of the back-to-school set pairs letter E with number 5: trace Ee, colour 5 into the ten frame, then find it missing from its own mini number line.

Download PDF

Morning work, set 1, day 6: letter F, number 6

Day 6 of the back-to-school set pairs letter F with number 6: trace Ff, colour 6 into the ten frame, then count a scatter of shapes and write how many.

Download PDF

Morning work, set 1, day 7: letter G, number 7

Day 7 of the back-to-school set pairs letter G with number 7: trace Gg, colour 7 into the ten frame, then keep an AB shape pattern going by drawing the two missing shapes.

Download PDF

Morning work, set 1, day 8: letter H, number 8

Day 8 of the back-to-school set pairs letter H with number 8: trace Hh, colour 8 into the ten frame, then circle whichever of two picture groups has more.

Download PDF

Morning work, set 1, day 9: letter I, number 9

Day 9 of the back-to-school set pairs letter I with number 9: trace Ii, colour 9 into the ten frame, then read tally marks and write the number they show.

Download PDF

Morning work, set 1, day 10: letter J, number 10

Day 10 of the back-to-school set pairs letter J with number 10: trace Jj, colour 10 into the ten frame, then find it missing from its own mini number line.

Download PDF

Morning work, set 1, day 11: letter K, number 11

Day 11 of the back-to-school set pairs letter K with number 11: trace Kk, colour 11 into the ten frame, then count a scatter of shapes and write how many.

Download PDF

Morning work, set 1, day 12: letter L, number 12

Day 12 of the back-to-school set pairs letter L with number 12: trace Ll, colour 12 into the ten frame, then keep an AB shape pattern going by drawing the two missing shapes.

Download PDF

Morning work, set 1, day 13: letter M, number 13

Day 13 of the back-to-school set pairs letter M with number 13: trace Mm, colour 13 into the ten frame, then circle whichever of two picture groups has more.

Download PDF

Morning work, set 1, day 14: letter N, number 14

Day 14 of the back-to-school set pairs letter N with number 14: trace Nn, colour 14 into the ten frame, then read tally marks and write the number they show.

Download PDF

Morning work, set 1, day 15: letter O, number 15

Day 15 of the back-to-school set pairs letter O with number 15: trace Oo, colour 15 into the ten frame, then find it missing from its own mini number line.

Download PDF

Morning work, set 1, day 16: letter P, number 16

Day 16 of the back-to-school set pairs letter P with number 16: trace Pp, colour 16 into the ten frame, then count a scatter of shapes and write how many.

Download PDF

Morning work, set 1, day 17: letter Q, number 17

Day 17 of the back-to-school set pairs letter Q with number 17: trace Qq, colour 17 into the ten frame, then keep an AB shape pattern going by drawing the two missing shapes.

Download PDF

Morning work, set 1, day 18: letter R, number 18

Day 18 of the back-to-school set pairs letter R with number 18: trace Rr, colour 18 into the ten frame, then circle whichever of two picture groups has more.

Download PDF

Morning work, set 1, day 19: letter S, number 19

Day 19 of the back-to-school set pairs letter S with number 19: trace Ss, colour 19 into the ten frame, then read tally marks and write the number they show.

Download PDF

Morning work, set 1, day 20: letter T, number 20

Day 20 of the back-to-school set pairs letter T with number 20: trace Tt, colour 20 into the ten frame, then find it missing from its own mini number line.

Download PDF

Morning work, set 2, day 1: letter U, number 11

Day 1 of the fall set pairs letter U with number 11: trace Uu, colour 11 into the ten frame, then count a bigger scatter of shapes and write the total.

Download PDF

Morning work, set 2, day 2: letter V, number 12

Day 2 of the fall set pairs letter V with number 12: trace Vv, colour 12 into the ten frame, then continue an AAB pattern, the one that catches chanters.

Download PDF

Morning work, set 2, day 3: letter W, number 13

Day 3 of the fall set pairs letter W with number 13: trace Ww, colour 13 into the ten frame, then circle the bigger numeral in each of three pairs.

Download PDF

Morning work, set 2, day 4: letter X, number 14

Day 4 of the fall set pairs letter X with number 14: trace Xx, colour 14 into the ten frame, then read tally marks that run past ten, bundles of five first.

Download PDF

Morning work, set 2, day 5: letter Y, number 15

Day 5 of the fall set pairs letter Y with number 15: trace Yy, colour 15 into the ten frame, then find it missing from a teens-and-twenties number line.

Download PDF

Morning work, set 2, day 6: letter Z, number 16

Day 6 of the fall set pairs letter Z with number 16: trace Zz, colour 16 into the ten frame, then count a bigger scatter of shapes and write the total.

Download PDF

Morning work, set 2, day 7: letter B, number 17

Day 7 of the fall set pairs letter B with number 17: trace Bb, colour 17 into the ten frame, then continue an AAB pattern, the one that catches chanters.

Download PDF

Morning work, set 2, day 8: letter D, number 18

Day 8 of the fall set pairs letter D with number 18: trace Dd, colour 18 into the ten frame, then circle the bigger numeral in each of three pairs.

Download PDF

Morning work, set 2, day 9: letter P, number 19

Day 9 of the fall set pairs letter P with number 19: trace Pp, colour 19 into the ten frame, then read tally marks that run past ten, bundles of five first.

Download PDF

Morning work, set 2, day 10: letter Q, number 20

Day 10 of the fall set pairs letter Q with number 20: trace Qq, colour 20 into the ten frame, then find it missing from a teens-and-twenties number line.

Download PDF

Morning work, set 2, day 11: letter M, number 21

Day 11 of the fall set pairs letter M with number 21: trace Mm, colour 21 into the ten frame, then count a bigger scatter of shapes and write the total.

Download PDF

Morning work, set 2, day 12: letter N, number 22

Day 12 of the fall set pairs letter N with number 22: trace Nn, colour 22 into the ten frame, then continue an AAB pattern, the one that catches chanters.

Download PDF

Morning work, set 2, day 13: letter G, number 23

Day 13 of the fall set pairs letter G with number 23: trace Gg, colour 23 into the ten frame, then circle the bigger numeral in each of three pairs.

Download PDF

Morning work, set 2, day 14: letter J, number 24

Day 14 of the fall set pairs letter J with number 24: trace Jj, colour 24 into the ten frame, then read tally marks that run past ten, bundles of five first.

Download PDF

Morning work, set 2, day 15: letter S, number 25

Day 15 of the fall set pairs letter S with number 25: trace Ss, colour 25 into the ten frame, then find it missing from a teens-and-twenties number line.

Download PDF

Morning work, set 2, day 16: letter C, number 26

Day 16 of the fall set pairs letter C with number 26: trace Cc, colour 26 into the ten frame, then count a bigger scatter of shapes and write the total.

Download PDF

Morning work, set 2, day 17: letter A, number 27

Day 17 of the fall set pairs letter A with number 27: trace Aa, colour 27 into the ten frame, then continue an AAB pattern, the one that catches chanters.

Download PDF

Morning work, set 2, day 18: letter E, number 28

Day 18 of the fall set pairs letter E with number 28: trace Ee, colour 28 into the ten frame, then circle the bigger numeral in each of three pairs.

Download PDF

Morning work, set 2, day 19: letter R, number 29

Day 19 of the fall set pairs letter R with number 29: trace Rr, colour 29 into the ten frame, then read tally marks that run past ten, bundles of five first.

Download PDF

Morning work, set 2, day 20: letter T, number 30

Day 20 of the fall set pairs letter T with number 30: trace Tt, colour 30 into the ten frame, then find it missing from a teens-and-twenties number line.

Download PDF

School days of the week tracing

Monday to Friday on handwriting guides, one solid example and traceable repeats per row, because the morning routine starts with what day it is.

Download PDF

Weather words tracing

The five weather words the daily pages keep asking about, on guides: trace sunny to windy so circling the icon can grow into writing the word.

Download PDF

Number words tracing, one to ten

One to ten written out and traceable, the bridge between the numeral the child traces daily and the word they will soon be asked to read.

Download PDF

Morning work star chart

Twenty numbered outline stars, one to colour for each finished morning page: a whole set fits on one chart and the child watches the month fill up.

Download PDF